Loading

Musktracker

Elon Musk (@elonmusk) on Musktracker

Elon Musk @elonmusk · 9 Nov

Project Crystal Sun https://t.co/UsJwu97AW5

sawyermerritt @sawyermerritt · 9 Nov

Tesla has officially started construction of its massive new $10 billion solar manufacturing facility near Houston, Texas! Construction is expected to finish in 2028, with commercial operations starting in Q1 2029. Total direct and indirect economic impact of the project is estimated to generate ~$6.4B in state and local taxes, and increase State of Texas GDP by ~$107 billion. The factory will be a vertically integrated solar manufacturing facility, and it'll include: • Wafer Manufacturing • Ingot Manufacturing • Coating • Metallization and Printing Lines • Cell Testing and QC • Automation and Material Handling • Cleanroom and Production Support • Site Infrastructure • Chemical Storage and Delivery • Utility Infrastructure • Environmental and Safety Systems

Author
Elon Musk @elonmusk
Posted
09 Nov 2026, 15:21 UTC
Original
https://x.com/elonmusk/status/2119812607117062451

281 replies · 210 reposts · 1.5k likes · 376k views

Counts are frozen at the first fetch.

Elon Musk (@elonmusk) on Musktracker